TM5-6675-326-14
1-13 ORGANIZATIONAL PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) -
Continued
1-13.2 PMCS Procedures
1-13.2.1 PMCS are designed to keep the equipment in good working
condition by performing periodic service tasks.
1-13.2.2 Service intervals provide you with time schedules that determine
when to perform specified service tasks.
1-13.2.3 If your equipment fails to operate after PMCS is performed,
immediately report this condition to your supervisor.
1-13.3 PMCS Columnar Entries
1-13.3.1 Item Number Column. Item numbers are assigned in chronological
ascending sequence regardless of interval designation.
These numbers are
used for TM number Column on DA Form 2404, Equipment Inspection and
Maintenance Worksheet in recording results of PMCS.
1-13.3.2 Interval Column. This column determines the time period
designated to perform your PMCS.
1-13.3.3 Item to be Inspected Column. This column lists functional
groups and their respective assemblies and subassemblies as shown in the
Maintenance Allocation Chart (appendix B).
1-13.3.4 Procedures Column.
The column describes the procedures
necessary to perform the check.
1-36