TM 5-6675-325-14
Table 5-1.
OPERATOR PREVENTIVE MAINTENANCE CHECKS AND SERVICES - Cont
B - Before
W - Weekly
AN - Annually
(Number) - Hundreds of Hours
D - During
M - Monthly
S
- Semiannually
A - After
Q - Quarterly
BI - Biennially
ITEM
NO.
5
IN-
TER
VAL
B
ITEM TO BE INSPECTED
PROCEDURE
QUANTITY PROCESSING SYSTEM (PLANIMETER) - Cont
Inspect Foot Switch.
1.
Inspect foot switch for cracks or breaks.
2.
Inspect foot switch cord for frays or breaks.
For Readiness
Reporting,
Equipment Is
Not Ready/
Available If:
Foot switch
is damaged.
Foot switch
cord is
damaged.
5-34