TM 5-6675-323-14
4-5.
OPERATOR PREVENTIVE MAINTENANCE CHECKS AND SERVICES.
a. Before You Operate. Always keep in mind the WARNINGS and CAUTIONS. Perform
y o u r before (B) PMCS.
Always keep in mind the WARNINGS and CAUTIONS. Perform
b. While You Operate.
y o u r during (D) PMCS.
A f t e r You Operate.
B e sure to perform your after (A) PMCS.
c.
I f Your Equipment Fails to Operate. T r o u b l e s h o o t w i t h p r o p e r e q u i p m e n t .
d.
Report any deficiencies using the proper forms. See DA Pam 738-750.
4-5.1 P M C S
Procedures.
a . PMCS are designed to keep the equipment in good working condition by
performing periodic service tasks.
b. Service intervals provide you, the operator, with time schedules that determine
when to perform specified service tasks.
c. The "Equipment is Not Ready/Available If" column is used for identification of
conditions that make the equipment not ready/available for readiness reporting
d.
If your equipment fails to operate after PMCS is performed, immediately report
this condition to your supervisor.
P e r f o r m weekly as well as before operation if you are the assigned operator
e.
a n d have not operated the item since the last weekly or if you are operating the
item for the first time.
f.
I t e m number column.
I t e m numbers are assigned in chronological ascending
s e q u e n c e r e g a r d l e s s o f i n t e r v a l d e s i g n a t i o n . T h e s e numbers are used for your "TM
N u m b e r " Column on DA Form 2404, Equipment Inspection and Maintenance Worksheet in
recording results of PMCS.
g. Interval columns. This column determines the time period designated to
perform your PMCS.
h.
Item to be inspected and procedures column. This column lists functional
groups and their respective assemblies and subassemblies as shown in the Maintenance
Allocation Chart (Appendix B). The appropriate check or service procedure follows
the specific item to be inspected.
i.
Equipment is not ready/available if: column. This column indicates the
reason or cause why your equipment is not ready/available to perform its primary
mission.
4-7