TM 5-6675-321-14
Table 4-1.
OPERATOR PREVENTIVE MAINTENANCE CHECKS AND SERVICES - Cont
ADHESIVE WAX COATER - Cont
Drain Wax and Clean - Cont
14.
Plug in ac power cord and turn MAIN switch ON.
Allow wax to melt and roller assembly to seat
i t s e l f .
Press down firmly on roller assembly when
wax has melted to seat roller.
15.
R e i n s t a l l t o p d e c k c o v e r . I f w a x c o a t e r i s n o t t o
b e u s e d , r e i n s t a l l t o p r o l l e r c o v e r.
For Readiness
Reporting,
Equipment Is
Not Ready/
Available If:
B - Before
W . Weekly
AN - Annually
(Number) - Hundreds of Hours
D - During
M - Monthly
S
- Semiannually
A - After
Q - Quarterly
BI - Biennially
ITEM TO BE lNSPECTED
ITEM
NO.
PROCEDURE
4
W
4-6.
OPERATION UNDER USUAL CONDITIONS.
4-6.1 Operating Procedures.
a.
Place wax coater on firm, level surface.
Plug power cord into grounded ac
o u t l e t .
b.
Lift up top deck c o v e r.
4-24
IN-
TER-
VAL