Table 5-3. ORGANIZATIONAL
B - Before
D - During
A - After
lTEM
NO.
1
lN-
TER-
VAL
S
W - Weekly
TM 5-6675-319-14
PREVENTIVE MAINTENANCE CHECKS AND SERVICES - Cont
AN - Annually
(Number) - Hundreds of Hours
M - Monthly
S - Semiannually
Q- Quarterly
BI . Biennially -
ITEM TO BE INSPECTED
PROCEDURE
PHOTOGRAPHIC PRINT DRYER - Cont
Service Print Dryer - Cont
27.
28.
29 .
30.
31.
32.
33.
Remove blower motor bulkhead and blower motors
by pulling upward.
Disconnect blower motor electrical connections.
Remove screws and blower motors from bulkhead.
Inspect gaskets and replace as necessary.
Clean blower motors with hand air pump to
remove dust and dirt. Reinstall blower
motors to bulkhead and reinstall assembly
i n c a b i n e t.
Reinstall bottom roller assembly.
Slide gear motor and bracket to left to
engage roller drive gear and coupling.
Tighten gear motor mounting screws.
5-25