TM 5-6675-319-14
Table 2-1.
OPERATOR PREVENTIVE MAINTENANCE CHECKS AND SERVICES - Cont
B - Before
W . Weekly
AN - Annually
D - During
M - Monthly
S
- Semiannually
A
ITEM
NO.
11
2-26
After
lN-
TER-
VAL
B
Q - Quarterly
BI
- Biennially
ITEM TO BE INSPECTED
PROCEDURE
FILM/PAPER PROCESSOR SYSTEM - Cont
Service Recycling and Storage Tanks - Cont
2 .
Connect hoses to external drains.
3 .
4.
5 .
R o t a t e r e c y c l i n g d i r e c t i o n a l f l o w v a l v e t o
For Readiness
Reporting,
Equipment Is
Not Ready/
Available If:
d r a i n p o s i t i o n a n d d r a i n r e c y c l i n g t a n k.
After recycling tank is drained, place recycl -
ing directional flow valve to pump position.
Turn on water supply.
(Number) - Hundreds of Hours