TM 5-6675-316-14
(3) Remove bolts from shock mounts.
NOTE
Be sure section is level before continuing this procedure. (Refer to
Chapter 1 for leveling procedures.)
(4) If bubble level indicates machine is not level, insert leveling tool, and raise or lower front left leg until
X-CARRIAGE
BUBBLE LEVEL PLACED
IN CENTER OF RAIL
(5) Place bubble level approximately in center of X-rail. If bubble level indicates machine is out of level, insert
leveling tool and raise or lower rear right leg until bubble indicates level.
(6) Unlock fine adjustment device holding Y-carriage. Move Y-carriage to front end of Y-rail against rubber
stop.
(7) Place bubble level approximately in center of X-rail. If bubble indicates machine is out of level, insert
leveling tool and raise or lower right front leg until level.
(8) Repeat steps (1) through (7) until machine is level.
(9) Reinstall side panels.
NOTE
Do not reconnect machine to shock mounts as long as it is in use.
(10) Insert drafting tool in X-carriage dovetail mount (table 3-5, items 1 and 3). Check that point does not touch
glass surface. Gap of 0.040 in. to 0.060 in. (1 .02 mm to 1.52 mm).
Change 1
3-53