TM 5-6675-316-14
Table 4-1.
OPERATOR PREVENTIVE MAINTENANCE CHECKS AND SERVICES - Cont
B - Before
W - Weekly
AN - Annually
(Number) - Hundreds of Hours
D - During
M - Monthly
s
- Semiannually
A - After
Q - Quarterly
BI
- Biennially
ITEM
NO.
6
7
B
B
ITEM TO BE INSPECTED
PROCEDURE
SPLIT-STAGE LIGHT TABLE - Cont
Inspect Reel Brackets.
Check
spinal
for security of mounting, free movement of
es, and slight end-play of reels.
NOTE
Make sure spring clips securing optical
mount are disengaged.
Inspect Optical Mount.
Check that optical mount can be moved left-right
(X-axis), front-back (Y-axis), and up, but cannot
be pushed down.
For Readiness
Reporting,
Equipment Is
Not Ready/
Available If:
Reel brackets
are missing
or broken.
Optical
mount binds
or slips.
4-15