TM 5-3610-287-24
2-32. REPLACE SPARE ROLLER RACK COVER (CONT)
Remove top frames (4).
5.
Remove top rollers from roller rack assembly.
6.
Remove two center supports (5).
7.
Remove lower rollers.
8.
Remove tape fasteners (6) from roller rack cover bases (7) and side of
9.
roller rack bottom frames (8).
Scrape adhesive residue from roller rack cover base (7).
10.
WARNING
CHEMICAL HAZARD. Use rubber cement thinner in a well-
ventilated area. Failure to do so may result in damage to
respiratory system. Wear gloves and goggles to prevent
injuries to skin and eyes.
Clean adhesive residue from roller rack bottom frames (8) with rubber
11.
cement thinner.
INSTALLATION
WARNING
CHEMICAL HAZARD. Use adhesive in a well-ventilated area.
Adhesive is harmful to eyes and skin. In case of contact
with eyes, immediately flush eyes with water for 15
minutes, then seek medical help. In case of contact with
skin, wipe off with dry cloth, then wash with soap and
water.
1.
Install new tape fasteners on roller rack cover bases (7) and side of
roller rack bottom frames (8) with adhesive.
2. Install lower rollers.
3.
Install center supports (5).
4.
Install top rollers.
Install top frames (4) and secure wingnuts (2) on locking spindles (3).
5.
Install new roller rack cover (1).
6.
7.
Close and lock equipment door.
8.
Connect blackout curtain to equipment door.
2-82