TM 5-3610-287-10
Table 2-1.
Preventive Maintenance Checks and Services (Cont)
B - Before Operation
D - During Operation
A - After Operation
Q - Quarterly
W - Weekly
M - Monthly
Equipment Is
Item To Be Inspected
Interval
Item
Not Ready/
No.
Procedure
Available If:
D
M
A
W
B
Section Exterior (Cont)
ground cable end, and ground
2
(Cont)
D, item 7). Reconnect ground
cable lug to ground rod.
Section is not
b. Disconnect ground cable
grounded.
(4) from power entry panel
(5). Clean terminal and
ground cable end with wire
Reconnect ground cable to
power entry panel. Reconnect
power cable to external power
source. Turn on power.
.
Power entry
POWER ENTRY PANEL. Inspect
3
panel or con-
for accumulated dirt or
nectors are
corrosion. Clean terminals
damaged.
as needed with spiral wire
WARNING
SHOCK HAZARD. Do not handle or clean power cable assembly or
connectors while power cable is connected to external power
source. Death or serious injury may result.
.
Power cable is
POWER CABLE. Turn off power
4
cracked or cut.
to power cable (l). Discon-
nect power cable from
external power source.
Inspect power cable for
kinks or cracks. Inspect
Connectors are
connectors for dirt or
damaged.
damage. Wipe power cable
insulation with clean, dry
2-8