TM 5-3610-286-20
2-32.
Ductor Roller Swing Mechanism (cont).
c. Install. (figure 2-61)
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
(13)
(14)
2-168
Install two supporting bolts (1).
install two needle bearings (2) in pull rod (3).
Install pull rod (3) on swing piece (4) and replace retaining ring (5).
Install swing piece (4) on mounting stud (6).
Install bearing bolt (7) in pull rod (3) and replace washer (8) and hex nut (9).
Install two needle bushings (10) in pull rod (11).
Install pull rod (11) on mounting stud (12).
Install needle bearings (13) in pull rod (14).
Install pull rod (14) in swing piece (4) and replace pin (15) and tapered pin (16).
Install other end of pull rod (14) on mounting stud (12) and replace washer (17) and
retaining ring (18).
Install bearing bolt (19) through lower end of pull rod (11), and through hole (20) in side
wall and install washer (21) and hex nut (22).
Replace roller bearing (23) in support piece (24).
Replace support piece (24) on swing piece (4) and replace washer (25) and retaining
ring (26).
Replace two washers (27) and two socket-head cap screws (28) through support piece
(23) into supporting bolts (1).
NOTE
FOLLOW-ON MAINTENANCE:
(1) Install ink fountain assembly (para. 2-24).
(2) Install lubrication distribution components (para. 2-78).
(3) Install main guard and accessories assembly (D/S) (para. 2-20).