TM 5-3610-286-10
2-9.
PREPARATION FOR MOVEMENT
CAUTION
Prior to moving Press Section, perform operating
procedures (para 2-7g thru i). Failure to do so will
result in damage to the Printing Press.
a. Feeder End
(1) Remove paper from feeder pile board.
(2) Lower feeder pile board to floor.
Remove and store in position
between cabinet and wall.
(3) Lock guide rail, storage cabinet , and nonstop feeder rods in
place with red thumbscrews.
(4) Lock cylinder cover and safety gate in place.
(5) Lock static eliminator bar in place.
b.
Operator Side
(1) Slide footstep over hole.
(2) Secure with pin.
c.
Delivery End
(1) Lower delivery pile board to floor. Remove paper. Remove,
store, and lock delivery pile board in position between cabinet and wall.
(2) Lock delivery side door (operator side) in place.
CAUTION
Ensure footstep is locked UNDER the delivery. Failure
to do so will damage section walls.
(3) Lock footstep under delivery.
(4) Raise manual inking roller no. 15 and remove distributor roller
no. 16. Push manual inking roller no. 15 back and into distributor roller
no. 16 position.
Secure with thumbscrew. Secure distributor roller no. 16
in roller rack.
Secure roller rack.
(5) Remove washup basin from storage rack and lock in position on
inking assembly.
Lock safety gate in place.
2-110