TM 5-3610-285-14
Table 5-5. ORGANIZATIONAL TROUBLESHOOTING - Cont
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
6.
REPLENISHER PUMP DOES NOT ACTIVATE WHEN FILM IS FED. MAIN DRIVE SWITCH IS ON AND REPL
PUMPS SWITCH IS IN AUTO - Cont
Step 8. Actuate detector switches, one at a time, while checking voltage between terminal block connector 3-31
and ground.
(a)
If voltage is 2.0 V dc or less, proceed to step 9.
(b)
If voltage is 12 V dc, replace defective detector switch (paragraph 5-16.11).
Step 9. With both detector switches actuated, check voltage between wire 84 on relay U5 and ground.
(a)
If 2.0 V dc or less is present, proceed to step 10.
(b)
If 12 V dc is present, replace standby control circuit board 500 (paragraph 5-16.4).
5-120