TM 5-3610-259-14
NOTE
This step must be accomplished if sec-
tion is placed in operation in darkness,
fog, or mist under blackout conditions.
14.
Close blackout curtains, if required.
15.
Turn on circuits in following order:
l
l
l
Individual lighting switches.
Curbside and roadside air conditioners/heaters as directed by
TM 5-4120-367-14.
Check operation of individual equipment switches.
16.
Connect telephone lines to
posts.
17.
Check blackout switches.
18.
Plug in emergency lighting
corresponding telephone binding
and turn switch to ready.
1-37