2-12.3 Repair Parts.
Repair parts are listed and illustrated in
and Special Tools List, TM 5-361O-285-24P covering organizational
this equipment.
2-13.
SERVICE UPON RECEIPT.
2-13.1 Checking Unpacked Equipment.
Inspect the equipment for damage incurred during shipment.
been damaged, report the damage on DD form 6, Packing Improvement
b. Check the equipment against the packing list to see if the
TM 5-3610-259-14
the Repair Parts
maintenance for
If equipment has
Report.
shipment is
complete.
Report all discrepancies in accordance with the instructions of DA Pam
738-750.
c.
Check to see whether the equipment has been modified.
2-14.
ORGANIZATIONAL PREVENTIVE MAINTENANCE CHECKS AND SERVICES.
PMCS are designed to keep the equipment in good working condition by
performing certain tests, inspections, and services.
The intervals provide you, the
organizational technician, with time schedules that determine when to perform
specified tasks.
b.
Item number column.
Item numbers are assigned in chronological ascending
sequence regardless of interval designation.
These numbers are used for your TM
Number column on DA Form 2404, Equipment Inspection and Maintenance Worksheet, in
recording the results of PMCS.
Interval column.
This column determines the time period designated to
perform your PMCS.
d.
Item to be inspected and procedures column. This column lists functional
groups and their respective assemblies and subassemblies as shown in the Maintenance
Allocation Chart (Appendix B).
The appropriate check or service procedure follows
the specific item to be inspected.
e.
List of tools and materials required for PMCS is as follows:
Item
Quantity
Flat Tip Screwdriver
1
1/2 in. Drive Socket Set
1
Hex Head Key Wrench Set
1
Nonflammable Flushing Solvent (Item 59, Appendix E) ar
Vacuum Pump Filters
4
2-37