TM 5 3610-257-14
e.
Perform weekly as well as before operation if you are the assigned operator and have not operated the item since
the last weekly or if you are operating the item for the first time.
f.
Item number column. Item numbers are assigned in chronological ascending sequence regardless of interval
designation. These numbers are used for your "TM Number" column on DA Form 2404, Equipment Inspection and
Maintenance Worksheet in recording results of PMCS.
g.
Interval columns. This column determines the time period designated to perform your PMCS.
h.
Item to be inspected and procedures column. This column lists functional groups and their respective assemblies
and subassemblies as shown in the Maintenance Allocation Chart (Appendix B). The appropriate check or service
procedure follows the specific item to be inspected.
i.
Equipment is not ready/available if: column. This column indicates the reason or cause why your equipment is
not ready/available to perform its primary mission.
j.
List of tools and materials required for PMCS is as follows:
Item
Quantity
Dusting Brush
1 ea
Cheesecloth (Item 4, Appendix E)
ar
Detergent (Item 8, Appendix E)
ar
Vaccum Cleaner
1 ea
3-12