TM 5-3610-253-14
Table 3-1. OPERATOR PREVENTIVE MAINTENANCE CHECKS AND SERVICES - Cont
(Number) - Hundreds of Hours
AN - Annually
W - Weekly
s - Semiannually
M - Monthly
BI - Biennially
Q - Quarterly
For Readiness
ITEM TO BE INSPECTED
Reporting,
lN-
Equipment Is
TER-
PROCEDURE
Not Ready/
VAL
Available If:
PAPER STITCHER - Cont
w
Inspect - Cont
Deflection
6. Check V-belt tension. Deflection at center of
is over
belt should be approximately 1/4 in. (6.35 mm).
1/2 in.
.(12.7 mm).
7. Reinstall screw and rear belt guard.
8.
Remove two screws and stitcher head guard.
9.
Lift swivel spring and move to side.
Withdraw swivel from swivel bushing.
10.
3-12