TM 5-2330-305-14
Section III. OPERATION UNDER USUAL CONDITIONS
2.3.1 ASSEMBLY AND PREPARATION FOR USE
1. Perform preventive maintenance checks and services as pecified in Table
2-1.
2. Be sure that front supports (landing gear) are down.
3. Move crank handles from stowed position and raise leveling jacks to full
up position. Stow handles.
CAUTION
BE SURE VOLTAGE CONTROL UNIT OUTPUT
CABLE IS PLUGGED INTO CHASSIS ELEC-
TRICAL CONNECTION BEFORE PROCEEDING.
4. Back tractor into position ensuring that fifth wheel fully engages and
locks trailer king pin.
5. Raise landing gear to full up position and store crank handle.
6. If tractor has 24 Vdc electrical interconnect power cable, proceed as
follows:
Place voltage control unit bulb quantity selector to 16-12 V bulb
position.
2-10