TM 5-6675-331-14&P
2-8
PREPARATION FOR MOVEMENT. (Cont'd)
c.
Preparing Shelter for Movement. (Cont'd)
(4)
Install 8 floor brackets (1).
NOTE
Floor bracket has 3 positions: OPEN - for removal or installation of floor bracket; LOCK - for locking floor
bracket and PLUG - in this position installation holes are covered.
(5)
Stow photo interpretation kit in assigned position in shelter.
(6)
Stow quantity processing set in assigned position in shelter.
WARNING
Cable reel weighs in excess of 80 pounds. Ensure that two soldiers lift the reel together. Failure to do so
may result in personal injury or damage to equipment.
(7)
Install cable reel with main power cable on shelter door.
2-53