TM 5-6675-331-14&P
2-4.
PREPARATION FOR USE. (Cont'd)
h.
Unloading Shelter. (Cont'd)
(8)
Move coiled power cable to curb side of shelter and place on ground.
(9)
Stow empty cable reel (4) in trailer.
(10)
Remove Quantity Processing Set (7) and place inside tent.
WARNING
Ensure two or more persons are available to lift heavy equipment. Failure to do so may result in serious
injury or damage to equipment.
(11)
Remove equipment from reusable containers (8) and place equipment into designated position.
(12)
Place empty containers inside trailer.
(13)
Remove Ground Rod (9) and place on ground on curb side of shelter near Main Power Cable.
(14)
Photo Interpretation Kit (10) remains in shelter.
WARNING
Ensure two or more persons are available to lift heavy equipment. Failure to do so may result in serious
injury or damage to equipment.
(15)
Remove two of the Field File Cabinets (11) from shelter and place in assigned locations in tent.
2-33