TM 5-6675-331-14&P
2-3
PMCS PROCEDURES. (Cont'd)
Table 2-1. OPERATOR'S PREVENTIVE MAINTENANCE CHECKS AND SERVICES
(Cont'd)
Operator Preventive Maintenance Checks and Services -for DDSS
LOCATION
NOT FULLY
ITEM
ITEM TO BE
MISSION CAPABLE
NO
INTERVAL
CHECK/SERVICE
PROCEDURES
IF:
WARNING
ELECTRICAL SHOCK
Ensure that all
circuit breakers and
"Main Switch" are off
before applying power
to the DDSS. Failure
to do so may result
in death or serious
injury.
7
Before
Power Hookup
Box
a. Cover
Check ball stud,
Cover can not be
Assembly
cover prop rod, and
secured to
stud assemblies for
shelter.
missing, bent, or
broken hardware.
2-7