TM 5-6675-328-14
Table 1-1. OPERATOR PREVENTIVE MAINTENANCE CHECKS AND SERVICES - Cont
B - Before
W - Weekly
AN - Annually
(Number) - Hundreds of Hours
D - During
M - Monthly
S - Semiannually
A - After
Q - Quarterly
BI - Biennially
ITEM TO BE INSPECTED
For Readiness
ITEM
IN-
Reporting,
NO.
TER-
Equipment Is
VAL
PROCEDURE
Not Ready/
Available If:
VAN BODY - Cont
1
Inspect Exterior - Cont
B/W
8.
Visually inspect ground connections to be sure
Grounding
ground cable is connected to terminal lug and
connec-
ground rod. If necessary, clean:
tions are
broken or
missing.
WARNING
Electrical shock hazard. Power cable must be
deenergized before servicing entry panel
connections. Death can result from failure to
observe these safety precautions.
a.
Turn power off to cable. Disconnect from power
source.
b.
Disconnect ground lug from ground rod.
c.
Clean lug, cable end, and rod with wire brush.
d.
Reconnect ground cable lug to rod.
e.
Disconnect ground cable end from entry panel.
f.
Clean terminal and cable end with wire brush.
g.
Reconnect ground cable to entry panel.
h.
Reconnect cable to power source. Turn power on.
B
9.
Inspect two boarding ladders for:
Steps broken
or will not
a.
Secure attachment of handrails.
lock in
place.
b.
Broken steps.
c.
Locking pins in place.
1-18