TM 5-6675-325-14
Table 1-3. ORGANIZATIONAL PREVENTIVE MAINTENANCE CHECKS AND SERVICES - Cont
D-During
B - Before
W - Weekly
AN - Annually
(Number)-
Hundreds of Hours
M - Monthly
S
-Semiannually
A - After
Q - Quarterly
BI
-Biennially
ITEM
NO.
2
M
ITEM TO BE INSPECTED
PROCEDURE
VAN BODY - Cont
Service Lighting System - Cont
2. Padlock safety switch.
3. Tighten al 1 loose screws, bolts, and clamps.
4. Check which switches, switch plate outlets, recep-
tacles, and posts require repair.
5. Check for loose screws and nuts on ceiling, console
lights, circuit breaker panels, and conduits.
6. Remove padlock.
7. Turn on main circuit breaker and safety switch.
1-55