TM 5-6675-324-14
1-6.2 Preparation for Movement.
a.
Inventory equipment and supplies.
b.
Install tiedowns in tiedown sockets.
Secure authorized equipment in proper containers or as specified by appro-
private chapters.
d. Secure straps and remove slack from tiedowns.
e.
Inflate shock absorbers.
(1) Remove all valve caps.
CAUTION
To prevent damage to equipment or air shocks during transportation,
inflate air shocks correctly. Do not exceed 70 psi (483 kPa) for the
Diazo copy machine and plain paper copier.
(2) Connect air hose to valve.
1-35