TM 5-6675-324-14
NOTE
This step must be accompli shed if section is placed n operation in dark-
ness, fog, mist, or under blackout conditions.
(16) Close blackout curtains, if required.
(17) Turn on circuit breakers in following order:
(a) Individual lighting.
(b) Curbside and roadside air conditioners/heaters.
(18) Connect telephone lines to corresponding interior binding posts*
(19) Check blackout switches.
(20) Plug in emergency lighting and turn switch to READY.
(21) Fully deflate air shocks until Diazo copy machine and plain paper copier
rest on top of air shocks.
1-34