TM 5-6675-321-14
3-5.1 PMCS Procedures.
p e r i o d i c s e r v i c e t a s k s.
a. PMCS are designed to keep the equipment in good working condition by performing
b . S e r v i c e i n t e r v a l s p r o v i d e y o u , t h e o p e r a t o r , w i t h t i m e s c h e d u l e s t h a t
determine when to perform specified service tasks.
c .
The Equipment is Not Ready/Available If column is used for identification of
conditions that make the equipment not ready/available for readiness reporting
purposes or denies use of the equipment until corrective maintenance is performed.
d.
If your equipment fails to operate after PMCS is performed, immediately report
t h i s c o n d i t i o n t o y o u r s u p e r v i s o r.
e.
Perform weekly as well as before operation if you are the assigned operator
and have not operated the item since the last weekly or if you are operating the
i t e m f o r t h e f i r s t t i m e.
f .
Item number column. Item numbers are assinged in chronological ascending
sequence regardless of interval designation. These numbers are used for your "TM
Number Column on DA Form 2404, Equipment Inspection and Maintenance Worksheet in
recording results of PMCS.
g . I n t e r v a l c o l u m n s .
This column determines the time period designated to
perform your PMCS.
h.
Item to be inspected and procedures column. This column lists functional
groups and their respective assemblies and subassemblies as shown in the
Maintenance Allocation Chart (Appendix B). The appropriate check or service
procedure follows the specific item to be inspected.
i .
Equipment is not ready/available if: column. This column indicates the reason
or cause why your equipment is not ready/available to perform its primary mission.
j .
List of tools and materials required for PMCS is as follows:
I t em
Q u a n t i t y
Cheesecloth (Item 5, Appendix E)
a r
Lens Cleaner (Item 4, Appendix E)
a r
Silicone Spray (Item 20, Appendix E)
a r
3-5