TM 5-6675-317-14
Table 2-1. OPERATOR PREVENTIVE MAINTENANCE CHECKS AND SERVICES - Cont
B . Before
W - Weekly
AN - Annually
D - During
(Number)
M - Monthly
s
- Hundreds of Hours
- Semiannually
A . After
Q . Quarterly
B1 - Biennially
ITEM
NO.
2
lN-
TER-
VAL
B
ITEM TO BE INSPECTED
For Readiness
Reporting,
PROCEDURE
Equipment Is
Not Ready/
Available If:
DRAFTING, SCRIBING/TRACING TABLE - Cont
Service.
WARNING
Death or serious injury may occur from electrical
shock unless power cord is unplugged before servicing.
1.
Unplug power cord.
2. Pull cabinet assembly lock release ring and
swing out cabinet assembly.
3. Loosen tilt lock until it clears table top
assembly.
4. Rotate table top assembly until glass surface
is on top.
Table top
does not
rotate.
2-8