TM 5-6675-315-14
w.
Remove tape on wires and hook up wires to terminals indicated by tags on each wire.
x.
Check that all connections are tight and no bare wires are showing.
y.
Close relay box.
z.
Reinstall feed table and close front cover.
aa.
Move machine over shock mounts.
ab.
Aline mounting holes on machine over bolt holes on air shocks.
ac.
Insert spacer plates over air shocks.
CAUTION
When installing mounting bolts, be sure bolts are not cross threaded.
ad.
Insert mounting bolts and washers on all four corners into air shocks and tighten.
ae.
Raise rollers on all four corners.
af.
Tighten all mounting bolts.
ag.
Inflate air shocks if preparing for transport mode.
2-36. PREPARATION FOR STORAGE AND SHIPMENT . Contact your battalion for packing and shipping instructions.
Section X DIRECT/GENERAL SUPPORT MAINTENANCE
2-37. REPAIR PARTS, SPECIAL TOOLS; TEST, MEASUREMENT, AND DIAGNOSTIC EQUIPMENT (TMDE); AND
SUPPORT EQUIPMENT.
2-37.1 Common Tools and Equipment. For authorized common tools and equipment, refer to the Modified Table of
Organization and Equipment (MTOE) applicable to your unit.
2-37.2 Special Tools; Test, Measurement, and Diagnostic Equipment; and Support Equipment. Special tools, TMDE,
and Support Equipment is listed in the applicable repair parts and special tools list and in Appendix B of this manual.
2-37.3 Repair Parts. Repair parts for this equipment are listed and illustrated in the Repair Parts and Special Tools List,
TM 5-6675-315-24P covering direct/general support maintenance for this equipment.
2-226