TM 5-6675-315-14
Table 2-7. OPERATOR PREVENTIVE MAINTENANCE CHECKS AND SERVICES - Cont
B - Before
W - Weekly
AN - Annually
(Number) - Hundreds of Hours
D - During
M - Monthly
S - Semiannually
A - After
Q - Quarterly
BI - Biennially
ITEM TO BE INSPECTED
For Readiness
IN
Reporting
ITEM
TER-
PROCEDURE
Equipment Is
NO.
VAL
Not Ready/
Available If:
SHREDDER-BAGGER - Cont
1
B
Service and Inspect Shredder-Bagger - Cont
NOTE
Machine must be moved away from wall to perform the
following PMCS procedures (paragraph 2-35.11).
Screws for bottom side panel are mounted through
spacer bushings placed between outside of panel and
frame of shredder-bagger. Do not lose these bushings.
They must be reinstalled for panel to be mounted.
Place all covers in area away from working space.
2. Remove screws and left lower cover.
2-171