TM 5-6675-315-14
i.
Item to be inspected and procedures column. This column lists functional groups and their respective
assemblies and subassemblies as shown in the Maintenance Allocation Chart (Appendix B). The appropriate check or
service procedure follows the specific item to be inspected.
j.
Equipment is not ready/available if: column. This column indicates the reason or cause why your equipment is
not ready/available to perform its primary mission.
k.
List of tools and materials required for PMCS is as follows:
Item
Quantity
Flat Tip Screwdriver
1 ea
Parts Brush
1 ea
Cheesecloth (Item 3, Appendix E)
ar
General Purpose Detergent (Item 4, Appendix E)
1 qt
SAE 30 Lubrication Oil (Item 7, Appendix E)
1 qt
5 mm Hex Head Key Wrench
1 ea
5/16 in. Combination Wrench
1 ea
Vacuum Cleaner
1 ea
2-169