TM 5-6675-315-14
f.
Item number column. Item numbers are assigned in chronological ascending sequence regardless of interval
designation. These numbers are used for your "TM Number" column on DA Form 2404, Equipment Inspection and
Maintenance Worksheet in recording results of PMCS.
g.
Interval columns. This column determines the time period designated to perform your PMCS.
h.
Item to be inspected and procedures column. This column lists functional groups and their respective
assemblies and sub-assemblies as shown in the Maintenance Allocation Chart (Appendix B). The appropriate check or
service procedure follows the specific item to be inspected.
i.
Equipment is not ready/available if: column. This column indicates the reason or cause why your equipment is
not ready/available to perform its primary mission.
j.
List of tools and materials required for PMCS is as follows:
Item
Quantity
Wire Brush
1 ea
6 in. Adjustable Wrench
1 ea
Flat Tip Screwdriver
1 ea
Vacuum Cleaner
1 ea
Cheesecloth (Item 3, Appendix E)
ar
General Purpose Detergent (Item 4, Appendix E)
ar
Paint (Items 10, 10A and 10B, Appendix E)
ar
Paint Brushes
ar
Change 1 1-12
