TM 5-6675-302-14&P
Section II. MOVEMENT TO A NEW WORKSITE
2-5. Dismantling for Movement.
tion 2 is removed from its tribrach and moved for-
a. The amount of dismantling will vary to the
application during actual surveying conditions.
b. To dismantle, disconnect all electrical cables
from battery box and instrument store cables in
appropriate place. Remove light concealing hood
cone and reflector from the target; store in carry-
ing case. Remove the target, tribrach and battery
box; store in carrying case, fold up the tripod,
fasten locking strap, and the equipment is ready
for movement to a new location.
c. Figure 2-10 illustrates the field procedure for
traversing with the theodolite and target. Stations
1 -- 2 -- 3 have been measured; the theodolite at sta-
ward to occupy the tribrach of the tripod at station
3. The target is removed from the tribrach at sta-
tion 1 and is placed in the tribrach at station 2. The
tripod with its tribrach is removed from station 1
and proceeds to station 4, collecting the target
from station 3. At station 4, the target is clamped
into the tribrach and is then centered over the
ground mark. Angles 2 -- 3 -- 4 can now be
measured, and so forth, until the traverse is com-
pleted.
2-6. Reinstallation after Movement. Refer to
paragraph 2-3 for setting-up instructions.
Figure 2-10. Traversing with the odolite and target, models 242406 or USATS-79
2-10