ARMY TM 5-6675-238-14
MARINE CORPS TM 08839A-14/1
(a) Tag and unsolder wires from power supply
PS3 (110) terminals.
(b) Remove six screws (106), washers (108), and
lockwashers (107); remove power supply
PS3 (110) from power supply assembly
(109),
NOTE
Spread heat conductive sealing compound
(340 or G641) on back of power supply
before installing.
(2) Replacement.
(a) Install power supply PS3 (110) on power
supply assembly (109) and secure with six
screws (106), washers (108), and lockwashers
(107).
(b) Solder wires to power supply PS3 (110)
terminals.
d. Overvoltage Protector Z1, Z2, Z3, or Z4. Re-
move and replace overvoltage protector Z2 (116, figure
8-6, sheet 4) as follows:
(1) Removal.
(a) Tag and unsolder wires from overvoltage
protector Z2 (116) terminals.
(b) Remove two screws (119), washers (117),
and lockwashers (118); remove overvoltage
protector Z2 (116) from power supply as-
sembly (109).
NOTE
Spread heat conductive sealing compound
(340 or G641) on back of overvoltage
protector before installing.
(2) Replacement.
(a) Install overvoltage protector Z2 (116) on
power supply assembly (109) and secure
with screws (119), washers (117), and lock-
washers (118).
(b) Solder wires to overvoltage protector Z2
(116) terminals.
8-23. Signal Processor Unit Adjustments. The SPU
adjustments consist of adjusting four modular power
supplies to their specified trip voltage, and logic no. 2
electronic component assembly A2 adjustments, Adjust-
ments of the modular power supplies and logic no. 2
electronic component assembly A2 should be checked
every 90 days or sooner if indicated by the self-test
procedure. The overvoltage protectors are normally not
adjusted unless a malfunction is suspected. If an over-
voltage protector is replaced, the new one must be
adjusted before the SPU wires are soldered to its termi-
nals. Connect cable W201 to 115-VAC power, cable
W203 to the tape reader, cable W204, and cable W209
as shown in figure 8-2. See figures 8-7, 8-8, and 8-9 for
location of adjustments and test jacks and perform
adjustment procedures in accordance with the following
paragraphs.
Blue bus terminals W1 and W2 contain
115-VAC.
a. Modular Power Supply PSI Voltage Adjustment.
Perform voltage adjustment of modular power supply
PS1 as follows:
(1) Connect digital voltmeter (DVM) test leads to
+28V and RTN test jacks,
(2) Press SPU ON switch-indicator to on (switch-
indicator lights).
NOTE
Prior to making voltage adjustments, take
cover off the adjustment screw.
(3) Adjust modular power supply PS1 voltage
adjustment for +28 (±1)V.
(4) Place cover back on adjustment screw and
disconnect DVM test leads.
(5) Press SPU ON switch-indicator to off (switch-
indicator goes out).
b. Modular Power Supply PS2 Voltage Adjustment.
Perform voltage adjustment of modular power supply
PS2 as follows:
(1) Connect DVM test leads to + 5V and RTN
test jacks.
(2) Press SPU ON switch-indicator to on (switch-
indicator lights).
(3) Adjust modular power supply PS2 voltage
adjustment for + 5 (±0.04)V.
(4) Press SPU ON switch-indicator to off (switch-
indicator goes out),
(5) Disconnect DVM test leads,
c. Modular Power Supply PS3 Voltage Adjustment.
Perform voltage adjustment of modular power supply
PS3 as follows:
(1) Connect DVM test leads to + 15V and COM
test jacks.
(2) Press SPU ON switch-indicator to on (switch-
indicator lights).
(3) Adjust modular power supply PS3 voltage
adjustment for + 15 (±0.04)V.
8-94