TM 5-3610-286-20
2-20.
Main Guard Assembly.
This task covers:
a. Remove
b. Install
INITIAL SETUP
Tools
Equipment Conditions
6 mm hex key
Dampening olution container removed (para. 2-13)
8 mm hex key
Belt guard removed (para. 2-17)
10 mm combination wrench
Ink fountain guard removed (para. 2-15)
14 mm combination wrench
17 mm combination wrench
1.0 x 1.6 x 0.5 mm flat-tip screwdriver
a. Remove. (figure 2-21)
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
Loosen lock nut (1) and remove oil bypass valve knob (2).
Remove lock nut (1), two screws (3), plate (4) and rubber gasket (5).
Rmeove oil bypass valve (6).
Remove three socket-head screws (7) in D/S frame at delivery end of guard.
Remove four socket-head screws (8) in D/S frame under bottom of guard.
Remove two hex-head screws (9) at bottom of guard.
Remove four socket-head screws (10) at feeder end of guard.
Remove one hex-head spacer (11).
Remove socket-head screw (12) and spacer (13) in D/S frame at top of guard.
Remove two socket-head screws (14) in D/S frame at feeder end of guard.
Remove guard (15).
2-82
