TM 5-3610-252-14
b.
Check the equipment against the pack
Report all discrepancies in accordance with
(1) Inventory sections against Compon
Lists (Appendix C).
ing list to see if shipment is complete,
the instructions of DA Pam 738-750.
ents of End Item and Basic Issue Items -
(2) Inventory expendable supplies contained in section as shown in Appendix E.
(3) Conduct operational checks on equipment in accordance with the chapters
in this manual when operators are available and power can be safely provided to the
van body.
c.
Check to see whether the equipment has been modified.
1-14. ORGANIZATIONAL PREVENTIVE MAINTENANCE CHECKS AND SERVICES
a. PMCS are designed to keep the equipment in good working condition by
performing certain tests, inspections, and services.
The intervals provide you, the
organizational technician, with time schedules that determine when to perform
specified tasks.
b.
Item number column.
Item numbers are assigned in chronological ascending
sequence regardless of interval designation.
These numbers are used for your TM
Number column on DA Form 2404, Equipment Inspection and Maintenance Worksheet, in
recording the results of PMCS.
c. Interval columns.
This column determines the time period designated to
perform your PMCS.
d.
Item to be inspected and procedures column. This column lists functional
groups and their respective assemblies and subassemblies as shown in the Maintenance
Allocation Chart (Appendix B).
The appropriate check or service procedure follows
the specific item to be inspected.
e. Preventive maintenance checks and services for the air conditioners/heaters
are contained in TM 5-4120-367-14.
f. List of tools and materials required for PMCS is as follows:
Item
Quantity
Vacuum Cleaner
1 ea
8 in. Adjustable Wrench
1 ea
Cross Tip Screwdriver
1 ea
Flat Tip Screwdriver
1 ea
Spring Scale
1 ea
Padlock
1 ea
Flashlight
1 ea
1-50