TM 5-3610-252-14
(15) Set main circuit breaker ON.
NOTE
This step must be accomplished if section is placed
ness, fog, mist, or under blackout conditions.
(16) Close blackout curtains, if required.
(17) Turn
(a)
(b)
(c)
in operation
in dark-
on circuit breakers in following order:
Individual lighting.
Curbside and roadside air conditioners/heaters.
Curbside and roadside receptacles.
(18) Connect telephone lines to corresponding interior binding posts.
(19) Check blackout switches.
(20) Plug in emergency lighting and turn switch to READY.
1-32