TM 5-3610-252-14
c.
Pump handle and turn adjusting stud to right until forks have raised 2
to 3 in. (5.0 to 7.6 cm).
Stop pumping and continue to turn adjustinq
stud until forks start to lower.
fork lowering.
d.
Turn adjusting stud three-quarter
locknut.
e.
If operation is not satisfactory,
Turn-adjusting stud to left to stop
turn to left.
Lock by tightening
place lever in lower position.
f. Remove overload valve cap.
g.
Insert 5 mm hex head key wrench into slot in adjusting screw behind
overload valve cap.
Turn adjusting screw to left as far as it will go.
Turn right one-quarter to one-half turn.
h. Reinstall valve cap and tighten.
i.
Test operation in raise and lower positions.
2-17. PREPARATION FOR STORAGE AND SHIPMENT.
Contact your battalion for packing
and shipping instructions.
Section V DIRECT/GENERAL SUPPORT MAINTENANCE
There are no assigned direct/general support maintenance tasks for this equipment.
2-38