TM 5-6675-322-14
1-6.2 Preparation for Movement.
a.
Inventory equipment and supplies.
b.
Install tiedowns in tiedown sockets.
c .
Secure authorized equipment in proper containers or as specified by appro-
p r i a t e c h a p t e r s .
d. Secure straps and remove slack from tiedowns.
WARNING
Death or serious injury may occur if power cable is disconnected while
power is on.
1-37