TM 5-6675-321-14
(19) Check blackout switches.
(20)
Plug
in
emergency
lighting
and
turn
switch
to
READY.
1-6.2 Preparation for Movement .
a.
Inventory equipment and supplies.
b. Install tiedowns in tiedown sockets.
c. Secure authorized equipment in proper containers or as specified by appro-
p r i a t e c h a p t e r s .
d. Secure straps and remove slack from tiedowns.
WARNING
Death or serious injury may occur if power cable is disconnected from
section while power is on.
e.
Turn equipment switches OFF.
1-34