Table 4-1.
OPERATOR PREVENTIVE MAINTENANCE CHECKS AND SERVICES - Cont
B - Before
W - Weekly
AN - Annually
D - During
M - Monthly
S
- Semiannually
A - After
Q - Quarterly
BI - Biennially
ITEM
NO.
1
lN-
TER-
VAL
B
ITEM TO BE INSPECTED
PROCEDURE
(Number) - Hundreds of Hours
ADHESIVE WAX COATER - Cont
Inspect - Cont
7.
Inspect wax in wax tray for suspended dust, dirt,
o r f o r e i g n m a t t e r.
8.
R e i n s t a l l i n n e r p a n e l.
9.
Reinstall top pressure roller. Examine gap
between top pressure roller and coating roller to
be sure they are not touching at any point.
Adjust as necessary (paragraph 4-10.2).
10.
Reinstall top roller cover and top deck cover, and
plug in power cord.
For Readiness
Reporting,
Equipment Is
Not Ready/
Available If:
4-15
TM 5-6675-321-14