TM 5-6675-319-14
a.
Drill pop rivets from braces and remove braces.
b.
Remove map and plan filing
and portable drawing board
c.
Remove knurled screws from
remove locking bracket.
cabinet cover, turn cover over, remove
from cover.
Retain screws for reuse.
locking bracket on each side of front .
WARNING
Serious personal injury can result if an inadequate number of personnel
are used to move the map and plan filing cabinet.
d.
e.
f .
g.
h.
i .
j .
k.
l .
screws
Then
Lift top and bottom sections free from base.
Remove screws and base from floor. Retain screws for reuse.
Install new base, and both top and bottom sections of map and plan
f i l i n g c a b i n e t .
Reinstall base to floor and secure with screws.
Reinstall bottom section to base and pop rivet braces to base and
bottom section.
Reinstall top section on bottom section and pop rivet braces to both
top and bottom sections.
Reinstall portable drawing board on cover and secure with screws.
Reinstall cover on top section and pop rivet braces to both the cover
and top section.
Reinstall locking brackets and secure with knurled screws.
10-7
