TM 5-6675-319-14
g .
Item number column. Item numbers are assigned in chronological ascending
sequence regardless of interval designation. These numbers are used for your "TM
Number column on DA Form 2404, Equipment Inspection and Maintenance Worksheet in
recording results of PMCS.
h.
Interval columns.
This column determines the time period designated to
perform your PMCS.
i. Item to be inspected and procedures column. This column lists functional
qroups and their respective assemblies and subassemblies as shown in the
Maintenance Allocation Chart (Appendix B). The appropriate check or service
procedure follows the specific item to be inspected.
j .
E q u i p m e n t i s n o t r e a d y / a v a i l a b l e i f : c o l u m n . T h i s c o l u m n i n d i c a t e s t he
reason or cause why your equipment is not ready/available to perform its primary
mission.
k .
List of tools and materials required for PMCS is as follows:
I t em
Q u a n t i t y
Wire Brush
1 ea
6 in. Adjustable Wrench
1 ea
Flat Tip Screwdriver
1 ea
Vacuum Cleaner
1 ea
Cheesecloth (Item 7, Appendix E)
a r
General Purpose Detergent (Item 8, Appendix E) ar
Paint (Items 22, 22A and 22B Appendix E)
a r
Paint Brushes
a r
1-14
Change 1