TM 5-6675-318-14
d .
If your equipment fails to operate
r e p o r t t h i s c o n d i t i o n t o y o u r s u p e r v i s o r .
d.
If your equipment fails to operate
r e p o r t t h i s c o n d i t i o n t o y o u r s u p e r v i s o r.
after PMCS is performed, immediately
after PMCS is performed, immediately
Perform weekly as well as before operation if you are the assigned operator
and have not operated the item since the last weekly or if you are operating the
i t e m f o r t h e f i r s t t i m e .
f .
Item number column.
Item numbers are assigned in chronological ascending
sequence regardless of interval designation.
These numbers are used for your TM
Number column on DA Form 2404, Equipment Inspection and Maintenance Worksheet, in
recording results of PMCS.
Interval columns .
This column determines the time period designated to
perform your PMCS.
h.
Item to be inspected and procedures column. This column lists functional
groups and their respective assemblies and subassemblies as shown in the
Maintenance Allocation Chart (Appendix B).
The appropriate check or service
procedure follows the specific item to be inspected .
i .
E q u i p m e n t i s n o t r e a d y / a v a i l a b l e i f : c o l u m n . T h i s c o l u m n i n d i c a t e s t he
reason or cause why your equipment is not ready/available to perform its primary
mission .
j.
List of tools and materials required for PMCS is as follows:
I t e m
Q u a n t i ty
Cotton Swabs (Item 6, Appendix E)
a r
Denatured Alcohol (Item 3, Appendix E)
a r
P r i n t
Paper
D r i ve
Head Cleaning Card
1 ea
Towel (Item 25, Appendix E)
ar
Roller Cleaner Card
1 ea
7-48
e .
g.