TM 5-6675-317-14
1-14. ORGANIZATIONAL PREVENTIVE MAINTENANCE CHECKS AND SERVICES
a.
PMCS are designed to keep the equipment in good working condition by
performing certain tests, inspections, and services.
The intervals provide you, the
organizational technician, with
specified tasks,
b.
Item number column. Item
sequence regardless of interval
Number column on DA Form 2404,
recording the results of PMCS.
time schedules that determine when to perform
numbers are assigned in chronological ascending
designation.
These numbers are used for your TM
Equipment Inspection and Maintenance Worksheet, in
Interval columns.
This column determines the time period designated to
perform your PMCS.
d.
Item to be inspected and procedures column. This column lists functional
groups and their respective assemblies and subassemblies as shown in the Maintenance
Allocation Chart (Appendix B).
The appropriate check or service procedure follows
the specific item to be inspected.
e.
preventive maintenance checks and services for the air conditioners/heaters
are contained in TM 5-4120-367-14.
f.
List of tools and materials required for PMCS is as follows:
Item
Vacuum Cleaner
Quantity
1 ea
8 in. Adjustable Wrench
1 ea
Cross Tip Screwdriver
1 ea
Flat Tip Screwdriver
1 ea
Spring Scale
1 ea
Padlock
1 ea
Flashlight
1 ea
1-53
