TM 5-6675-316-14
Table 10-2. ORGANIZATIONAL TROUBLESHOOTING - Cont
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
2. NO WATER AGITATION - Cont
Step 2.
Check continuity of power switch.
(a) If continuity does not exist, replace power switch (paragraph
10-16.2).
(b) If continuity does exist, replace circuit board
(paragraph 10-16.3).
10-16. MAINTENANCE PROCEDURES.
This section contains
functions for the ultrasonic
task requires more than one.
b. After completing each
instructions covering organizational maintenance
cleaner.
Personnel required are listed only if the
maintenance procedure, perform operational
sure that equipment is-properly functioning.
INDEX
PROCEDURE
Replace Power Cord . . . . . . . . . . . . . . . . . . . . . . . . . .
Replace Power Switch . . . . . . . . . . . . . . . . . . . . . . . . .
Replace Circuit Board . . . . . . . . . . . . . . . . . . . . . . . .
check to be
PARAGRAPH
10-16.1
10-16.2
10-16.3
10-11