TM 5-6675-316-14
Interval Columns.
This column determines the time period designated to
perform your PMCS.
h. Item to be inspected and procedures column. This column lists functional
groups and their respective assemblies and subassemblies as shown in the
Maintenance Allocation Chart (Appendix B).
The appropriate check or service
procedure follows the specific item to be inspected.
i.
Equipment is not ready/available if: column. This column indicates the
reason or cause why your equipment is not ready/available to perform its primary
mission.
j .
List of tools and materials required for PMCS is as follows:
Adhesive Wax, (Item 31, Appendix E)
5 bars
Wax Solvent, (Item 32, Appendix E)
ar
Plastic Utility Pail
1 ea
Cheesecloth, (Item 6, Appendix E)
ar
Rubber Hand Scraper
1 ea
Flat Tip Screwdriver
1 ea
8-10