TM 5-6675-316-14
Table 1-4. ORGANIZATIONAL TROUBLESHOOTING - Cont
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
4. NO POWER TO EQUIPMENT - Cont
Step 2.
Check circuit breaker input for 120 V ac.
(a) If input voltage is present, proceed to step 3.
(b) If input voltage is not present, refer to direct/general
support maintenance for repair or replacement of defective
wiring.
Check circuit breaker output for 120 V ac.
Step 3.
(a) If output voltage is present, proceed to step 4.
(b) If output voltage is not present, refer to direct/general
support maintenance for circuit breaker replacement
Remove receptacle and check for 120 V ac input.
Step 4.
(b) If not present, refer to direct/general support maintenance
for repair or replacement of defective wiring.
1-16. MAINTENANCE PROCEDURES.
This section contains instructions covering organizational maintenance
functions for the Drafting Support Section. Personnel required are listed only if
the task requires more than one.
b. After completing each maintenance procedure, perform operational check to be
sure that equipment is properly functioning.
INDEX
PARAGRAPH
PROCEDURE
Replace Fluorescent Lamp Ballast . . . . . . . . . . . . . . . . . . . 1-16.1
Replace Radio Frequency (RF) Filter . . . . . . . . . . . . . . . . . . 1-16.2