TM 5-6675-315-14
NOTE
Cutter and comber assemblies are removed in the following sequence: bushing, ring, special
spacer ring, combers, cutters, and cutter ring.
p.
Remove cutter and comber assemblies.
q.
Inspect all components for wear or damage. Replace combers and cutters as required.
NOTE
If blades become dull, new cutting edges may be obtained by simply reversing cutter assemblies
on upper and lower shafts.
Cutter and comber assemblies are reinstalled in the following sequence: cutter ring, cutters,
combers, special spacer ring, ring, and bushing.
r.
Reinstall cutter and comber assemblies.
s.
Reinstall sleeve, special spacer ring, ring, and bushing on both cutter and comber shafts.
t.
Reinstall end plate on cutter assembly.
u.
Reinstall cutter assembly into shredder-bagger.
v.
Reinstall mounting bolts that secure cutter assembly to machine housing.
w.
Reinstall conveyor belt assembly.
x.
Lubricate cutter assembly with GAA Grease (Item 6, Appendix E).
y.
Reinstall vane rotor assembly.
z.
Reinstall funnel plates.
aa.
Reinstall cutter safety switch and swing plate.
ab.
Reinstall V-belt pulley, V-belts, and adjust belt tension (paragraph 2-16.1).
ac.
Reinstall panels.
ad.
Turn on circuit breaker.
ae.
Turn on main power switch.
2-145
