TM 5-6675-306-24P
SECTION I
INTRODUCTION
1. Scope
support, and general support maintenance of the
theodolite.
2. General
a. Section II, Repair Parts List. A list of repair
parts authorized for use in the performance of
maintenance. The list also includes parts which
must be removed for replacement of the authorized
parts. Parts lists are composed of functional
groups in ascending numerical sequence, with the
parts in each group listed in figure and item
number sequence.
Bulk materials are listed in
NSN sequence, as the last group in Section II.
b. Section III, Special Tools List. A list of
special tools, TMDE, and support equipment
authorized for the performance of maintenance, at
the organizational level.
c. Section IV, National Stock Number and Part
Number Index. A list, in ascending numerical
sequence, of all National stock numbers appearing
in the listings, followed by a list, in alphanumeric
sequence, of all part numbers appearing in the
listings. National stock number and part numbers
are cross-referenced to each illustration figure and
item number appearance.
3. Explanation of Columns
The following provides an explanation of
columns found in the tabular listings:
a. Illustration. This column is divided as
follows:
(1) Figure number.
Indicates the figure
number of the illustration in which the item is
(2) Item number. The number used to identify
each item called out in the illustration.
b. Source,
Maintenance, and Recoverability
(1) Source code. Source codes are assigned to
tems to indicate the manner of acquiring
s for maintenance, repair, or overhaul
Source codes are entered in the first
positions of the Uniform SMR Code
Code
PA
PB
PC
PD
PE
PF
PG
KD
KF
KB
MO
MF
MH
M D
AO
AF
AH
AD
XA
XB
Definition
Item procured and stocked for anticipated or
known usage
Item procured and stocked for insurance purpose
because essentiality dictates that a minimum
quantity be available in the supply systems
Item procured and stocked and which otherwise
w o u l d b e c o d e d P A e x c e p t t h a t i t i S
deteriorative in nature
Support item, excluding support equipment,
procured for initial issue or outfitting and
stocked only for subsequent or additional initial
issues or outfittings Not subject to automatic
replenishment
Support equipment procured and stocked for
initial issue or outfitting to specified
maintenance repair activities
Support equipment which will not be stocked but
which will be centrally procured on demand
Item procured and stocked to provide for
sustained support for the life of the equipment
It iS applied to an item peculiar to the
equipment
which,
because of probable
discontinuance or shutdown of production
facilities,
would prove
uneconomical to
reproduce at a later time
An item of a depot overhaul/repalr kit and not
purchased separately Depot kit defined as a kit
that provides items required at the time of
overhaul or repair
An item of a maintenance kit and not purchased
separately Maintenance kit defined as a kit that
provides an item that can be replaced at
organizational or intermediate levels of
maintenance
Item included in both a depot overhaul/repair kit
and a maintenance kit
Item to be manufactured or fabricated at
organizational level
Item to be manufactured or fabricated at the
direct support maintenance level
Item to be manufactured or fabricated at the
general support maintenance level
Item to be manufactured or fabricated at the
depot maintenance level
Item to be assembled at organizational level
Item to be assembled at direct support
maintenance level
I t e m t o b e a s s e m b l e d a t g e n e r a l s u p p o r t
maintenance level
Item to be assembled at depot maintenace level
Item is not procured or stocked because the
requirements for the item will result in the
replacement of the next higher assembly
I t e m i s n o t procured o r s t o c k e d if n o t a v a i l a b l e
t h r o u g h s a l v a g e . r e q u i s i t i o n