TM 5-3610-285-14
1-16.12. Repair Blackout Curtain.
MOS: 83FJ6, Reproduction Equipment Repairer
or
41B, Topographic Instrument Repair Specialist
TOOLS:
Tool Kit, Light Machine Repair
Cross Tip Screwdriver
SUPPLIES: Hooks
Valance
Curtain
Nylon Hook and Pile Tape
Adhesive (Item 1, Appendix E)
a. Remove curtain from hooks.
b. Pull curtain and valance from nylon hook and pile tape.
c. Remove end screw, lockwasher, and fastening bracket from ceiling.
d. Replace damaged hooks.
e. Reinstall fastening bracket with hooks. Fasten with end screws and lockwasher.
f. Glue loose nylon hook and pile tape to wall or bracket. Replace tape if worn out.
g. Hook curtain to bracket.
h. Attach valance.
i. Check curtain for free movement.
1-77